Meet the Team: Grace Williams
Latest News Meet the Team:Grace Williams Each month we’re introducing you to a member of our expert team. This month is the turn of Office
Keep up to date with our latest news, events and happenings in the world of FEG Global.
Please visit Our Work to see our latest case studies and testimonials.

Latest News Meet the Team:Grace Williams Each month we’re introducing you to a member of our expert team. This month is the turn of Office

Latest News Guide to LEV systems Local exhaust ventilation systems (LEV systems) are essential for keeping certain workplaces safe for employees. Industries such as food

Latest News Do I need a CDM consultant? CDM Regulations are an essential to the safe management of a construction project, however they are often

The FEG Global engineering team recently designed and installed a new cold store for North East based prawn processing business, Libra Seafoods. The expansion meant increased capacity to allow for new opportunities and business growth.

2 Sisters Food Group needed a food conveyor systems installation to transport their potato products from existing line equipment to a new food transfer pump. Within the final process, the UK-based food manufacturer also needed to be able to dynamically weigh the potatoes.

2 Sisters Food Group needed a food conveyor systems installation to transport their potato products from existing line equipment to a new food transfer pump. Within the final process, the UK-based food manufacturer also needed to be able to dynamically weigh the potatoes.

We were appointed Principal Contractor for this £6.5m factory extension project, which involved converting a warehouse into a high care food production area and incorporating it into the main factory.

Our expert team of engineers designed and installed a conveyor system for a new pizza line that maximised the use of existing equipment.
We were commissioned by General Mills to undertake a £3.8m project to install a new high capacity frozen pastry production line, from feasibility to hand-over.

As part of an ongoing factory extension project the client required a new outgoing product cold store facility as the existing cold store capacity was no longer adequate.